Home / Insights / Manufacturing

What a frame-and-truss quote actually needs.

The drawings, loads and site information that let a manufacturer price accurately the first time.

Manufacturing
  • Plans, elevations and sections
  • Structural information or loads
  • Site wind classification
  • Cladding, lining and roofing
  • Site access
  • Delivery window

A frame and truss quote is only as good as the information behind it. Send a floor plan and ask for a price, and you will get a number with so many assumptions that it is really a guess.

Here is what we need to price a package properly, and why.

  • Architectural plans, elevations and sections. Wall heights, roof pitch and ceiling types decide most of the timber.
  • Structural information or loads. Who is carrying what, and whether there are point loads from the roof onto the frame.
  • Site wind classification (and snow or seismic data where relevant). This sets bracing, tie-downs and truss design.
  • Cladding, lining and roofing. Heavy roofs and masonry veneer change member sizes.
  • Site access. Crane availability and road access decide panel sizes and whether cassettes are practical.
  • Delivery window. Production slots and, for export, shipping schedules.
Every missing item becomes an assumption, and every assumption becomes a variation.

When our estimators work from the same documentation our detailers and engineers use, the quote and the shop drawings agree. That is the point of one workflow.

TOP PLATELINTELSTUDSOPENINGBRACINGBOTTOM PLATENOGGING@ 450 / 600 crs
Illustration: NESCA.

More insights

Have a project in mind?

Tell us about it and we will show you how we would approach it.